SCHÖNEFELD NORD

In recent years, Schönefeld has experienced a remarkable dynamic development. The proximity to the federal capital Berlin, the favorable location in relation to BER Airport, and the already existing good public transport connections make this area an extremely attractive place for future development.

In response to continued population growth, the city of Schönefeld is planning to develop a new mixed-use neighbourhood. The new neighboudhood, Schönefeld Nord, will cover approximately 160 hectares, eventually providing homes for up to 10,000 residents. In addition to housing, the area will include office and commercial space, schools, and various other infrastructure facilities. A dense network of green and open spaces will serve as the connecting element of the new neighbourhood.

Status of developments until completion
Hectares
0
New residents
0
Start of construction (School)
0

NEWS

Planungszeitung Ausgabe September 2025 - Beitragsbild Querformat

Fifth planning newsletter published!

In this issue, we take a closer look at key framework conditions for development – such as the high-voltage power line and the possible extension of subway line U7. You will also find more information about the station area as a future gateway to the district, as well as about the upcoming political self-commitment resolution.

more »
Bürgermeister Christian Hentschel (Mitte) gemeinsam mit Vertreter*innen aus Verwaltung, Politik und Bauunternehmen beim symbolischen Spatenstich für die verkehrstechnische Erschließung des Plangebiets Schönefeld Nord. V. l. n. r.: N. Berghof (Sachbearbeiterin Tiefbau), T. Schulz (Geschäftsführer PST GmbH), S. Bley (Verbandsvorsteherin MAWV), C. Hentschel (Bürgermeister Gemeinde Schönefeld), M. Matheis (Abteilung Vertrieb E.distherm), V. Brühl (techn. Bereichsleiter STRABAG AG) und A. Schwuchow (Sachgebietsleiterin Tiefbau und Infrastruktur) / Foto: Gemeinde Schönefeld

Groundbreaking ceremony for road E/E2

On September 29, a symbolic groundbreaking ceremony was held together with Mayor Christian Hentschel to mark the start of construction on the first section of road infrastructure for the Schönefeld Nord development area. With this step, the infrastructure connection around the new high school is secured – an important milestone for the future development of the entire neighborhood.

more »
Kita Holzwurm im Bau - Stand 09.07.2025

Construction Progress at Kita Holzwurm

The new “Holzwurm” daycare center on Pestalozzistraße in Schönefeld is taking visible shape. Built using modular construction, the facility will provide much-needed additional childcare places for the community in the near future.

more »

- PLANNING

The development of the northern part of Schönefeld is currently the largest housing project in the federal state of Brandenburg. The new neighborhood is designed to accommodate the diverse housing needs of different target groups in a highly integrated and well-connected area.

SCHEDULE

Groundbreaking ceremony for the new school building
High school with bilingual focus, barrier-free, and a three-court sports hall
15 May 2024
Online participation
Three-week interactive participation format on the project website
11 April 2024
Planning newsletter
First planning newsletter is published
26 January 2024
Commencement of construction for the secondary school
14 September 2023
Commencement of construction preparation measures
Preparations for the development of Planstraße E2 and the new high school begin
March 2023
Press release: Preliminary investigations
Consultants are commissioned to establish assessment criteria
22 August 2022
The competition has started
Urban planning and open space design competition has started
summer 2021
19 July 2024
Resolution charta Schönefeld Nord
Municipal council of Schönefeld adopts the strategic goals for the neighborhood
12th April - 3rd May 2024
Citizens workshop
Kick-off for public participation at Schönefeld town hall
March 2024
Website Schönefeld Nord
Website now online
4th quarter of 2023
Informative meeting
Informative meeting for property owners at Schönefeld town hall
April 2023
Preliminary investigations have started
September 2022
The winning team has been announced
RHA architects from Dortmund, along with landscape architects Carla Lo and Lindschulte Engineering Company, has won the competition
November 2021
Idea for a new urban district
A sustainable new urban neighbourhood is to be developed in the northern part of Schönefeld

THE AREA

NEWSLETTER

Our newsletter informs you about our latest developments.

Melden Sie sich für unseren Newsletter an:

Wir versenden keinen Spam!
Erfahren Sie mehr in unserer Datenschutzerklärung.

Gemeinde Schönefeld

Hans-Grade-Allee 11
12529 Schönefeld

Dezernat II
Baurecht und Planung
E-Mail: bauleitplanung@gemeinde-schoenefeld.de

DSK Deutsche Stadt- und Grundstücks-
entwicklungsgesellschaft mbH

Gertraudenstraße 20
10178 Berlin

E-Mail: schoenefeldnord@dsk-gmbh.de

QUESTIONS AND ANSWERS

With the aim to create a lively neighborhood that is socially and ecologically inclusive, whilst also meeting current and future demands for sustainability (including climate protection and low-emission mobility concepts) a urban design competition involving renowned planning offices was held in 2022.

The winning design by architects Reicher Haase Assoziierte (RHA) together with landscape architects Carla Lo and traffic planner Lindschulte envisions a large-scale residential development for approximately 10,000 people with accompanying infrastructure including schools, kindergartens, youth and healthcare facilities, commercial spaces, as well as green and open spaces.

Under German planning and building law, a strategic master plan provides the framework for the development of an urban area. The master plan integrates various planning requirements and builds the basis for planning applications. The elaboration of the master plan is carried out in phases for different areas within the planning area and includes, for example, adjustments to the characteristics and development of the area. The process to develop and continuously adjust various planning alternatives involves planners, land owners, the council and various experts. The complexity arises from the large size of the planning area, requirements for drainage, infrastructure, and a diverse land ownership structure. The master plan allows for the independent development of individual areas within the overall masterplan (framework).

On October 19th 2022, the city of Schönefeld agreed to work with RHA architects to further refine and qualify the urban planning concept of the winning design from the „Urban and Open Space Planning Competition Schönefeld Nord“ as a master plan. The overall process is managed by DSK Deutsche Stadt- und Grundstücksentwicklungsgesellschaft mbH.

As part of this qualification process, the conditions for further planning will be discussed with the council and further developed based on the planning competition guidelines. Additionally, detailed concepts and appraisals on various topics will be created to inform and support the planning and design process. The outcome of this process will build the foundation for the urban planning framework.

Residents can also participate in the process. Regular events and online participation opportunities will be held, allowing everyone to contribute.

The strategic development direction for the area will be defined by a so-called „utilization concept“. This includes topics such as residential and commercial uses, the location of central infrastructures, school sites, daycare centers, as well as building density and public realm design. The utilization concept serves as the basis for future developments needed to meet the population’s needs for education, housing, and infrastructure.

The design of green spaces, landscapes, playgrounds, public squares and spaces, sport grounds and other areas are part of the qualification of the master plan. The definition of the location of a cemetery, a review of water surfaces and parks, street design in coordination with transport planning, the development of concepts for peripheral development and transition spaces, the determination of open space requirements, rainwater management and the design of educational facilities will be part of the qualification process.

These various aspects will be integrated into the overarching master plan to create a harmonious and functional environment that meets the needs of the community and strengthens the identity of the new neighborhood.

With the help of an overarching transport concept, the primary focus is on establishing a road network hierarchy. This includes determining access to and connections of different types of transport (motorized vehicles, busses, cycling lanes, pedestrian areas as well as deliveries). As part of the concept, traffic volumes and traffic flows are analyzed to develop an optimal traffic network for all users.
Furthermore, road sections are designed to show street planting, rainwater management, utility lines, delivery acces as well as considering access for emergency and rescue vehicles.

The noise impact concept for the Berlin Brandenburg Airport includes general approaches and developments for noise reduction and encompasses both active and passive noise protection measures. These measures include, among other things, the designation of protection and compensation areas, night flight restrictions, and soundproofing for buildings affected by aircraft noise.

The planning area is not located in one of the noise protection zones affected by aircraft noise. The city of Schönefeld is required, under the EU Environmental Noise Directive, to carry out noise mapping and noise action planning, which will also specifically address aircraft noise. The report for Stage 4 of the noise action planning, along with the associated noise mappings, is expected to be published in the second half of 2024.

Further information https://lubb.berlin-brandenburg.de/aufgaben/flughafen-ber/fluglaerm/ und https://gemeinde-schoenefeld.de/stadtentwicklung-mobilitaet/umwelt-und-planung/laermaktionsplanung/

The current lack of infrastructure access, the existing property layouts, and landownership structures are currently preventing construction. The council does not yet own the land required to construct roads and other supporting infrastructure facilities. The planned construction plots do not align with the existing property structure and are often owned by different landowners, making coherent development currently unfeasible.

Preparatory investigations aim to obtain an extensive assessment of the current situation, the social, structural, and urban planning conditions and contexts, as well as the planning and development  goals to be pursued and the overall feasibility of the implementation. In particular, the willingness of landowners, tenants and leaseholders to participate in the implementation of the development goals should be examined and promoted.

The council intends to hold public participatory events during the conduction of the preparatory studies to discuss the preliminary investigation findings as well as the development goals. All interested parties, including landowners, tenants, leaseholders, and residents from adjacent areas, can participate. There is also the option to provide written feedback. Property owners and users can take advantage of a private consultation with the council and the planning consultants. During the private consultations, the possibilities for a development cooperation between the council and the landowners will be discussed.

Preliminary investigations have been conducted since March 2023. These investigations will assess whether an urban development measure (SEM) is necessary or if the development goals (planned construction and use in the area) can be achieved through other means.

The council makes the decision on whether or not an SEM should be conducted. This decision is based on a report that will be created after the completion of the preliminary investigations. The report contains recommendations regarding the implementation or non-implementation of an SEM in Schönefeld Nord.

It is expected that the completion of the development will take over 20 years.

Generally, the council aims to acquire the properties in the development area to ensure the prompt and comprehensive implementation of the master plan (§ 166 Abs. 3 BauGB). However, the council may refrain from acquiring the property if the owner agrees, through a contract with the council, to use or develop the property in accordance with the development objectives within a reasonable timeframe. In the case of implementing an SEM, the council intends to prioritize entering into such agreements with the landowners. Acquisition of property will only occur on a case-by-case basis if the development objectives cannot be achieved in any other way.

Contracts concerning the use of properties or buildings, as well as residential lease agreements, remain valid after the decision to implement an SEM. However, the town can terminate rental or lease agreements if required in order to achieve the development objectives. In such cases, the user is entitled to compensation if they suffer financial disadvantages due to the premature termination.

The council aims to develop the area in agreement and cooperation with landowners. Priority is given to concluding agreements between the council and landowners. However, in individual cases, expropriation of non-cooperative landowners is possible if the development goals can only be achieved this way.

Landowners who do not sell their property and do not develop it in accordance with the development goals during the SEM are required to pay a compensation to the council. The compensation amount is calculated based on the difference between the initial value (the value of the land unaffected by the development) and the final value (the value of the land influenced by the development at the end of the SEM).

The council is responsible for the overall development of the area. This primarily includes the construction of the necessary roads, pathways, and public squares, as well as other residential facilities (e.g., daycare centers, schools, green spaces, and playgrounds). The remaining properties acquired by the town that are not needed for infrastructure purposes will be sold to builders at the final value (land value after the completion of the development measure). The buyers must, as the ‚old‘ owners did before, commit to achieving the development goals. All other construction measures, i.e., the construction of residential and commercial buildings, will be carried out by private owners (buyers and ‚old‘ owners).